For all of October and November, I’ve been mostly DIY’ing my kitchen and flooring. I’ve spent most October demolishing and prepping everything for flooring and cabinets. November will be laying down flooring, building cabinets, installing countertops and applicances.
The Tea Owls love DIY!
Owl hardwood floor inspection. That is some nice maple.
We took down a wall in the room. The Tea Owls were crawling up in attics.
Ceiling Owl confirmed the wall that was there was not structural.
I have been so busy, that I am impressed that I am still able to roll out regular Oolong Owl posts. The amount of tea I have been drinking has been impressive. I do work in cycles of a week I will drink a bunch of tea, then next week I work on editing. With my schedule being crunched, I’ve been using any free hours to sit down and drink 2-5 teas and drafting reviews like crazy. Then I spend all the other time doing construction work.
What has suffered is this year’s Tea Owl crocheting production. I’m just too busted up to crochet, and the Tea Owls are too tired to hatch some eggs.